Modular
homes offer a more affordable contruction. We offer a way to get
better elavations that can only be done on site.
|
The
engineer will design your
foundation according to your home and soil conditions.
|
Pier
& beam, post tension system. This design starts with drilling
10' - 12' deep with steel installed according to the engineering
plan.
|
|
4
|
5
|
6
|
|
|
|
|
|
Now
we form up the foundation to the correct size, installing steel
and post tension cable according to the design. The engineer will
inspect before pouring the concrete
|
We
install straps that will connect to the home as we pour the concrete.
This will insure that the wind loads that the home was designed
for are maintained in the installation.
|
We
install the plumbing and get the site ready for installation of
home.
|
|
7
|
8
|
9
|
|
|
|
|
|
Modular
home is delivered
to site.
|
The
home in maneuvered into correct position. Then picked up with hydraulic
system so that the frame can be removed.
|
Frame
is totally removed. All floor joist, a double rib beam far exceed
any pier & beam floor stucture of a home built on site. Higher
standards must be used for the purpose of transporting home on the
road.
|
|
10
|
11
|
12
|
|
|
|
|
|
The
anchor straps are now
connected from the foundation
to the home.
|
This
home has a 6/12 pitch, hinged roof for transportation purposes.
We then raise it on site. Higher pitched roofs are available and
will add additional construction time. This is what separates us
from othe dealers.
|
This
home has 2 sections.
Your home could be 1-5 sections depending on floor plan and size.
|
|
13
|
14
|
15
|
|
|
|
|
|
Second
half is lifted and the
frame is removed.
|
House
is now in place and
ready to be trimmed out
and bricked.
|
Home
was sold with brick. This is installed just like site built.
|
|